K-BORDS

Craftsmanship since 1978

Through land, sea and mountains

Craftsmanship

Under the leadership of CEO Marc Schuermans, K-Boringen has already built an impressive record of tunnels with a diameter of up to 4 metres and well over 1 kilometre long for the supply and drainage of water, gas or as a conduit for pipes, laid under the city, the seabed and even through Swiss rocks.

Solutions

Carefully tailored to the specific project requirements, K-Boringen offers numerous solutions for controlled pipe jacking and drilling. Especially where obstacles exist - roads, dykes, rivers, canals, railways, foundations, existing tunnels or pipelines... - the "no dig" method offers significant advantages for the working environment. Environmental and traffic problems are kept to an absolute minimum.

Microtunnelling

The use of a trenchless approach for pipelines and tunnels has created a groundbreaking reputation. Taking on a challenge is therefore not an exception, but rather the rule. Through inventiveness, flexible partnerships and top-quality expertise, you can count on the necessary quality. In addition, the trenchless approach offers an optimisation of the Less Nuisance story. 

Project in the spotlight

Project - Luxembourg: 620m pipeline through sandstone

This project in collaboration with OBG Lux S.A and OBG Gruppect
A project we are immensely proud of. Watch our video and find out for yourself. 

Please accept statistics, marketing cookies to watch this video.

Our areas of expertise

Steered drilling

With sophisticated measurement and control technology via laser and theodolite

Controlled pipe jacking

Jacking pipes in all usual materials: reinforced concrete, vitrified clay and steel

Drill front support

Due to ground pressure, bentonite support pressure, increased air pressure or a combination of these

Overhaul and construction of drilling equipment

This within the own workplace

Straight and curved (3D) drillings

Whatever you are looking for, K-drilling can provide it

Tube diameters: 400mm to 4m Drill lengths: 1500mm or more

By hydraulic intermediate pressure stations and automated bentonite lubrication

Steered drilling

With sophisticated measurement and control technology via laser and theodolite

Controlled pipe jacking

Jacking pipes in all usual materials: reinforced concrete, vitrified clay and steel

Drill front support

Due to ground pressure, bentonite support pressure, increased air pressure or a combination of these

Overhaul and construction of drilling equipment

This within the own workplace

Straight and curved (3D) drillings

Whatever you are looking for, K-Boringen can provide it.

Tube diameters: 400mm to 4m

This with drilling lengths of 1500mm or more by means of hydraulic intermediate pressure stations and automated bentonite lubrication

Contact details

                                 Belgium Germany
                      Paalsteenstraat 36 | Magdeburg
                           3500 Hasselt

Contact details

info@k-boringen.com

BE: Paalsteenstraat 36 , 3500 Hasselt

DE: Magdeburg

Would you like to join us in building the smart and sustainable cities of the future?

Wondering why a job with APK Group suits you?

Would you like to join us in building the smart and sustainable cities of the future?

Wondering why a job with APK Group suits you?